PROBLEMS THAT ARE ENCOUNTERED IN CONCEALED INSTALLATION WORKS FOR BUILDINGS AND TODAY’S FAMILIAR CONDITION OF CURRENT INSTALLATION TECHNIQUE

 

In today’s world, during the construction of buildings like residence, work place, hotel etc, while the production of installation work through which liquid and gas pass is conducted, concrete is poured and wall plaster is completed respectively or without doing this, installation tubes are mounted over rooms, wet grounds or tubes are mounted into walls by way of opening a channel into a wall. However, one end of these tube ends, through which distribution is made to residence districts, separates from main distribution column tube or distributor collector and the other tube end over floor concrete ground or inside the wall towards the devices which will be installed to residence districts (radiator, cooler, armatures etc.)

 

According to the inlet-outlet tube connection conditions of devices, tube ends to be connected to devices, get out over the floor concrete with bends inside the wall or by way of using different guide turning parts are left open on residence district gaps of 25-100 cm length and installation, tube mountings, pressure and leakage tests are performed or not performed and the first stage of construction is completed and they wait for the completion of other necessary construction works. Under the circumstances, during the construction period of buildings, problems related to installation works are encountered.

 

  • As the installation tube ends are left open during the construction period of buildings, they get damaged and corroded throughout the construction works. So this inevitably puts the personnel who work in the construction site, into trouble.
  • As the installation tube ends remain open during the whole construction period; material residuals like concrete articles, sand, dust, cement etc enters into tubes and obstructs them or these residuals enter into the devices connected to the installation and cause some damages.
  • As there is not such product which provides standard for the compatible connection of tubes to devices on the point where they get out to the surface from ground or wall to be connected to devices; for this phase of installation, tube connection detail and measurements on the point where installation tube connects to the devices depend on the competence of the workers who perform the installation and this causes repairs difficult to compensate and installation problems once the construction is over due to mistakes made during the production stage.
  • During the construction period of buildings, as control tests are not constantly conducted, when the residence districts start to be used, water leakage problems through the tubes damaged during the construction period occur.
  • During the whole construction period, tubes are desired to be tested and so additional material is used. Later these materials get lost, wasted and discharged and this causes additional cost increase.
  • Plastic tube and additional parts connected to devices create an unpleasant look and it can not present an aesthetically pleasant view which in turn causes customer dissatisfaction.
  • Unpleasant look which is a result of modifications in these newly-completed buildings due to detail axis distortions and water leakage problems, which occur after the buildings are completed, cost increase and most importantly difficulties experienced by residence producers and customers occur.

 

DEVELOPMENT OF THE NEW PRODUCT AND ITS ADVANTAGES

 

This innovation has become a preferred product as it protects the tube ends which pass inside the ground finish coating or wall to be connected to devices like armature, radiator etc, which will be used in residential buildings through distribution collector or distribution main line tube during the production of concealed installation works throughout the construction period of buildings like residence, work place or hotel etc and as it secures the whole installation by way of constantly testing the tubes which connect to the devices, as it creates a pleasant appearance and it is also a preferred product to be used with protection box, tube addition bend and t-parts, coupling clamp, protective cover and visual cover group.

  • As the tube ends of the installation are inside the installation kit protection box, while the construction works continue, tube ends and addition parts are protected from impacts
  • Working place in the construction site can be easily used by the workers
  • Pressure water can always be kept in the tubes so it can always be tested
  • Tube ends are protected against corrosion so the installation life gets longer
  • As the connection parts are not too many, water leakages are minimized
  • As it has a pleasant appearance, it creates customer satisfaction
  • Axis distance can be appropriately adjusted in a way that it is easy on the eye
  • Practical mounting can be applied by way of standardization of installation mounting and protection against worker mistake
  • Contributing to cost-effectiveness by decreasing the wastage in pex tube
  • It can be connected to all kinds of device, armature and tube connections by creating solutions
  • When a problem occurs, tube can be replaced without breaking any part
  • For the water leakages which may occur many years later or after the radiator mounting; necessary intervention can be done without breaking anything thanks to its special top
  •  Installation kit which does not cause problems between customer and producer and which creates safety and beauty generates customer satisfaction.